Nice Engineering Technology
1. Quantity Check2. Maker Check3. Appearance Check4. Banding Check per pipe standard
1. Site Manager Designation2. Drawing Production & Selection per production area3. Confirmation with site manager4. Checking drawing for defects
1. Checking drawing for defects with 1st step2. Marking Process per pipe standard3. Marking per manufacturing type4. Arrangement per Production Line
1. Cutting with drawing2. SP/PT workload checking3. pipe endpiece workload checking
1. Checking Hole Process Horizontal2. Hole process depending on marking per pipe standard
1. Hole Expansion Work with T form according to the marking2. Checking the pipe damage when working3. Checking the oil pressure when working with STS
1.Checking horizontal2.Checking Polishing work side
1.Checking pipe standard & quantity per work in place2.Separate loading for welding process
1. Process separation per production process2. Checking screw gauge
1. Removal of foreign substance happened when welding & inside or outside of the pipe2. Removal of foreign sugstance in welding part & painting
1. Checking the height & distance between branch arm pipings after hole expansion process2. Checking product defects3. Water Pressure Test
1. Partial package according to the on-site request2. Package according to the welding part & site area
1. Checking the quantity & packaging products with site2. Checking product defects when loading